APB Pole Barns - T Series Kit Questionnaire
 
For DELIVERED pricing we must be able to GPS your site location.
Quotes with incomplete site addresses will not include freight.
 
Your Name
Your Email
Telephone No
Building Site AddressSite Address, City, County & State
 
(A) Width  
(B) Height  
(C) Length  
(D) Length  
(E) Width  
(F) Height  
Roof Pitch (4/12 is most common)
Snow Load (PSF)
Max Wind Speed
Roof Material Metal Shingle
Wall Cladding Metal T1-11 Vinyl
Overhead Doors Quantity, size, insulated, non insulated, gable, or eave end
Single Slider Quantity, size, insulated or not, slide left/right, gable or eave location
Double Slider Quantity, size, insulated or not, gable or eave location etc
Man Doors (Entry) Quantity, size, insulated or not
Windows Quantity and sizes
 
Eave Overhang (0"-24") Default is 0" no overhang
Gable Overhang (0"-24") Default is 0" no overhang
Specific Instructions
Regional or personal building preferences or anything else you want to say.